Abrogate $570m Accra-Tema expansion contract – NDC MPs demand

January 14, 2021
13 Views

The contract was signed between the government of Ghana and the South African firm, Mota – Engil.

The deal is for the expansion of the Accra-Tema Motorway into both three-lane and two-lane stretches.

READ MORE: Oil spillage causes accident on Tema Motorway

Last year, the Ministry of Roads & Highways announced that it has signed a contract with Portuguese conglomerate Mota-Engil, Engenharia E Constructao Africa S. A for the design and construction of the Accra-Tema Motorway and Extensions Project.

#left5::before{ content: “AD”; font-size: .6em; text-align: center; display: block; color: #bfbbbb7d; }

READ MORE: Massive slum springs up along Accra-Tema motorway

As part of the contract, the release said the existing 19.5kilometre motorway is to be reconstructed and expanded into a two-lane dual carriageway for the freeway and a three-lane dual carriageway for the urban highway. The freeway will remain concrete surfacing whilst the urban highway will be in asphaltic concrete with paved shoulders.

But the spokesperson for the NDC caucus on roads, Kwame Agbodza said the $570 million contracts were solely sourced without basis and should be terminated.

READ MORE: Demonstration looms on Tema motorway over deadly potholes

He said: “So we are telling the government, stop this process, Article 181 have been ignored.”

“The top five Ghanaian road contractors can do this at ease and the benefit will be better for Ghanaians,” the NDC MP added.

You may be interested

Investigators bust child trafficking syndicate in Ghana
Politics
1 views
Politics
1 views

Investigators bust child trafficking syndicate in Ghana

webby - January 21, 2021

Accra [Ghana], January 21 (ANI/Xinhua): Investigators in Ghana busted crime syndicates engaged in baby harvesting and child trafficking operating in…

Perseus Mining increases half-year gold production by 12% to 137,386 ounces as Yaouré kicks off
Gossip
1 views
Gossip
1 views

Perseus Mining increases half-year gold production by 12% to 137,386 ounces as Yaouré kicks off

webby - January 21, 2021

Perseus Mining Ltd (ASX:PRU) achieved half-year gold production of 137,386 ounces, up by 12% on the previous half-year and close to…

Idlib | HTS-affiliated “Al-Ghana’em Committee” raises rent of seized shops
Politics
2 views
Politics
2 views

Idlib | HTS-affiliated “Al-Ghana’em Committee” raises rent of seized shops

webby - January 20, 2021

On Jan 20, 2021 As residents in areas under the control of Hayyaat Tahrir Al-Sham are struggling with dire living…

Leave a Comment

Your email address will not be published.