{"id":15996,"date":"2026-05-22T13:23:50","date_gmt":"2026-05-22T13:23:50","guid":{"rendered":"https:\/\/gnbcc.net\/?p=15996"},"modified":"2026-05-22T13:23:55","modified_gmt":"2026-05-22T13:23:55","slug":"2027-to-test-renewable-energy-ambitions","status":"publish","type":"post","link":"https:\/\/gnbcc.net\/2027-to-test-renewable-energy-ambitions\/","title":{"rendered":"2027 to test\u00a0renewable energy ambitions"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The government is preparing to move the country\u2019s renewable energy agenda beyond pilot projects and policy commitments into a commercially driven expansion phase from 2027, betting on solar, wind and clean industrial power to reduce dependence on costly thermal generation and strengthen long-term energy security.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The planned transition, being championed by the Ministry of Energy and Green Transition, is expected to focus on utility-scale solar projects, battery storage systems, mini-grids, rooftop solar deployment and electric mobility infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But the push comes at a delicate moment for the power sector, which continues to struggle with mounting debt, transmission bottlenecks and recurring concerns over grid stability, raising questions about whether the country can translate renewable energy ambitions into large-scale commercial execution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of January 2026, the government paid US$1.47 billion to clear legacy energy-sector debts to Independent Power Producers (IPPs) and gas suppliers, restoring World Bank guarantees.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In an exclusive interview with the&nbsp;<em>Business and Financial Times (B&amp;FT)<\/em>, Director of Renewable at the Ministry of Energy, Seth Manu, said the Ministry\u2019s expanded mandate is intended to give greater policy focus and momentum to the country\u2019s transition agenda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are investing heavily in renewable energy. Currently, several solar projects are under construction, and we expect them to come online between 2027 and 2028, contributing significantly to Ghana\u2019s energy mix,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to him, the Ministry is also pursuing wind energy development, with feasibility studies ongoing at selected locations across the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cAt the same time, we are investing in transmission infrastructure to ensure the seamless integration of these renewable energy assets into the national grid,\u201d he added.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mr. Manu indicated that the government\u2019s renewable energy strategy extends beyond electricity generation, with efforts underway to decarbonise sectors such as agriculture, water supply and industry.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIn agriculture, for example, we are collaborating with the Ministry of Food and Agriculture to deploy renewable energy solutions to support irrigation systems nationwide. This initiative is intended to improve food security and help control inflation, because food inflation remains one of the biggest contributors to the country\u2019s overall inflation basket,\u201d he explained.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis vision is to position energy as a catalyst for the productive sectors of the economy. We believe this will help decarbonise the economy while also improving food production and affordability.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Ministry is also deploying renewable energy systems to support water treatment and distribution in underserved communities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are also working to decarbonise the water sector. Treating water for domestic and commercial use requires significant energy, so we are deploying renewable energy solutions to support community and small-town water systems,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to him, projects are already underway in parts of the Savannah and Central Regions, with plans to scale the interventions nationwide as the government works to improve access to potable water under the Sustainable Development Goals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The government is further encouraging industries and households to adopt distributed renewable energy systems to reduce pressure on the national grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One of the flagship interventions under this strategy is the Solar Net Metering Programme being implemented under the Scaling Up Renewable Energy Programme (SREP).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis initiative allows households and businesses to invest in solar energy systems connected to the national grid. Excess power generated can be exported to the grid and credited back to the owner under a contractual arrangement,\u201d Mr. Manu said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He noted that the programme is expected to unlock investment opportunities in renewable energy across industries and commercial facilities while improving the resilience of the national electricity network.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThese are just some of the interventions we are implementing to support Ghana\u2019s energy transition agenda. I can assure you that we are on course. With the support of the Finance Ministry, several strategic projects are currently being implemented, and within the next 12 to 24 months, Ghanaians will begin to see tangible results,\u201d he stated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Ministry is also pushing industries to invest in captive renewable energy systems for their own operations as part of efforts to reduce dependence on conventional power sources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are introducing several innovations, particularly within the clean captive and industrial energy space. This means businesses are being encouraged to invest heavily in renewable energy for their own use,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Among the government\u2019s largest planned renewable projects is the solar development at the Dawa Industrial Park, where approval has been granted for a 200-megawatt solar park expected to power industrial operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cA good example is the Dawa Industrial Park project, where approval has been granted for a 200-megawatt solar park, which could eventually be scaled up to between 1,000 and 1,200 megawatts,\u201d Mr. Manu disclosed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe project is already under construction, and we are hopeful that the first 100-megawatt phase will be commissioned by the end of next year.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While officials remain optimistic, some industry experts say that financing constraints and the power sector\u2019s fragile financial position could still undermine the country\u2019s renewable energy ambitions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The transition is also unfolding against the backdrop of continued dependence on thermal generation and recent grid disruptions, including the Akosombo Control Room Fire Incident, which exposed vulnerabilities within the country\u2019s electricity infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Still, the Ministry insists the foundations are being laid for what could become the country\u2019s most ambitious renewable energy expansion drive in decades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThat is why I remain optimistic that within the next 12 to 24 months, Ghana will witness significant investment in the green energy space and broader energy transition efforts,\u201d Mr. Manu said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Click&nbsp;<a href=\"https:\/\/thebftonline.com\/2026\/05\/19\/2027-to-test-renewable-energy-ambitions\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\"><strong>here<\/strong>&nbsp;<\/a>for source.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The government is preparing to move the country\u2019s renewable energy agenda beyond pilot projects and policy commitments into a commercially driven expansion phase from 2027, betting on solar, wind and clean industrial power to reduce dependence on costly thermal generation and strengthen long-term energy security. The planned transition, being championed by the Ministry of Energy<\/p>\n","protected":false},"author":10,"featured_media":15998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"yes","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[153],"tags":[],"class_list":["post-15996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-articles"],"jetpack-related-posts":[{"id":16083,"url":"https:\/\/gnbcc.net\/govt-targets-1400mw-renewable-energy-capacity-by-2030\/","url_meta":{"origin":15996,"position":0},"title":"Gov\u2019t targets 1,400MW renewable energy capacity by 2030","author":"Grace Agorigo","date":"May 29, 2026","format":false,"excerpt":"Government is targeting at least 1,400 megawatts (MW) of installed renewable energy capacity by the end of the decade as part of efforts to reduce energy costs, improve industrial competitiveness and accelerate the country\u2019s transition to sustainable energy. The Ministry of Energy and Green Transition said \u00a0the country currently has\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-22.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-22.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-22.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-22.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-22.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":13730,"url":"https:\/\/gnbcc.net\/ghana-to-host-refa-2025-in-accra-agi-and-afsia-join-forces-for-a-greener-future\/","url_meta":{"origin":15996,"position":1},"title":"Ghana to Host REFA 2025 in Accra: GNBCC Premium Member Dutch &amp; Co Joins Drive for a\u00a0Greener\u00a0Future\u00a0","author":"Michael Teye","date":"November 7, 2025","format":false,"excerpt":"The Association of Ghana Industries (AGI), in collaboration with the Africa Solar Industry Association (AFSIA), has announced its partnership to host the 2025 edition of the Renewable Energy Forum Africa (REFA) in Accra from December 3 to 4.\u00a0Dutch & Co, a Premium Member of the Ghana Netherlands Business & Culture\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":15109,"url":"https:\/\/gnbcc.net\/ivory-coast-considers-following-ghana-with-cocoa-price-cut-sources-say-3\/","url_meta":{"origin":15996,"position":2},"title":"MPS Sets New Benchmark for Sustainable Port Operations with Solar Energy Initiative","author":"Grace Agorigo","date":"February 20, 2026","format":false,"excerpt":"In line with its sustainability strategy and commitment to reducing carbon emissions,\u00a0The GNBCC member, Meridian Port Services Ltd (MPS), in partnership with another member, Dutch & Co.\u00a0have commenced the implementation of a solar power project at its container terminal, Terminal 3 at Tema Port. The initiative aims to diversify energy\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/02\/Newsletter-Blog-Media-1.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/02\/Newsletter-Blog-Media-1.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/02\/Newsletter-Blog-Media-1.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/02\/Newsletter-Blog-Media-1.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/02\/Newsletter-Blog-Media-1.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":12815,"url":"https:\/\/gnbcc.net\/dutch-co-successfully-installs-454-kwp-solar-pv-systems-for-sapholda-ventures\/","url_meta":{"origin":15996,"position":3},"title":"Dutch &amp; Co successfully installs 454 KWP Solar PV Systems for Sapholda Ventures","author":"Tracy Mensah","date":"January 19, 2024","format":false,"excerpt":"Leading solar energy specialists, Dutch & Co has ushered in the New Year successfully, thanks to the recent completion of a 454kWp Grid-Tie solar PV system for Sapholda Ventures. The installation provides clean, sustainable and affordable solar electricity to the newly built coldroom of Sapholda at their impressive logistics and\u2026","rel":"","context":"In &quot;GNBCC Members&quot;","block_context":{"text":"GNBCC Members","link":"https:\/\/gnbcc.net\/category\/gnbcc-members\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/10\/2024-01-19_0_Sapholda_Ventures_Solar_PV_project_competed_by_Dutch__Co._.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/10\/2024-01-19_0_Sapholda_Ventures_Solar_PV_project_competed_by_Dutch__Co._.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/10\/2024-01-19_0_Sapholda_Ventures_Solar_PV_project_competed_by_Dutch__Co._.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/10\/2024-01-19_0_Sapholda_Ventures_Solar_PV_project_competed_by_Dutch__Co._.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":13020,"url":"https:\/\/gnbcc.net\/fruit-company-limited-commits-to-solar-energy-benefiting-from200kwp-solar-pv-installation-in-tema-harbour\/","url_meta":{"origin":15996,"position":4},"title":"Fruit Company Limited Commits to Solar Energy; Benefiting from\n200KWp Solar PV Installation in Tema Harbour.","author":"Grace Agorigo","date":"May 10, 2024","format":false,"excerpt":"On 9th May, 2024, Dutch & Company, a leading solar energy firm,has achieved a significant milestone by installing and commissioning a rooftop solarsystem at the cold-room facility operated by The Fruit Terminal Company (FTC) in Tema Harbour, Ghana.","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2024\/05\/2024-05-10_1_200_kWp_Solar_installation_at_FTC_1.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2024\/05\/2024-05-10_1_200_kWp_Solar_installation_at_FTC_1.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2024\/05\/2024-05-10_1_200_kWp_Solar_installation_at_FTC_1.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2024\/05\/2024-05-10_1_200_kWp_Solar_installation_at_FTC_1.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":14537,"url":"https:\/\/gnbcc.net\/lack-of-industrial-energy-could-hamper-24-hour-economy-dream-dr-amin-adam\/","url_meta":{"origin":15996,"position":5},"title":"Lack of industrial energy could hamper 24-hour economy dream \u2013 Dr. Amin Adam","author":"Michael Teye","date":"January 8, 2026","format":false,"excerpt":"Former Minister of Finance Dr. Mohammed Amin Adam has maintained that the country\u2019s lack of industrial energy \u2013 which makes electricity tariffs unreasonably elevated \u2013 could hamper efforts to industrialise the country through government\u2019s 24-hour economy.","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/01\/Energy-Regulation.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/01\/Energy-Regulation.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/01\/Energy-Regulation.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/01\/Energy-Regulation.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/01\/Energy-Regulation.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-18.png","_links":{"self":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts\/15996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/comments?post=15996"}],"version-history":[{"count":1,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts\/15996\/revisions"}],"predecessor-version":[{"id":15999,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts\/15996\/revisions\/15999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/media\/15998"}],"wp:attachment":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/media?parent=15996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/categories?post=15996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/tags?post=15996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}