{"id":16083,"date":"2026-05-29T15:11:36","date_gmt":"2026-05-29T15:11:36","guid":{"rendered":"https:\/\/gnbcc.net\/?p=16083"},"modified":"2026-05-29T15:11:42","modified_gmt":"2026-05-29T15:11:42","slug":"govt-targets-1400mw-renewable-energy-capacity-by-2030","status":"publish","type":"post","link":"https:\/\/gnbcc.net\/govt-targets-1400mw-renewable-energy-capacity-by-2030\/","title":{"rendered":"Gov\u2019t targets 1,400MW renewable energy capacity by 2030"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Government is targeting at least 1,400 megawatts (MW) of installed renewable energy capacity by the end of the decade as part of efforts to reduce energy costs, improve industrial competitiveness and accelerate the country\u2019s transition to sustainable energy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Ministry of Energy and Green Transition said &nbsp;the country currently has about 280MW of installed renewable energy capacity, with pipeline projects expected to deliver nearly 600MW by 2028.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sector minister, John Abdulai Jinapor, in a speech read on his behalf at the AGI Sustainable Energy B2B Expo in Accra, said affordable and reliable energy remains critical to business growth and export competitiveness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the ministry, businesses currently pay between GH\u00a21.90 and GH\u00a22 per kilowatt-hour of electricity consumed, making energy costs a major production challenge for industry.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ministry said government is therefore pursuing policies and interventions aimed at delivering cheaper, cleaner and more sustainable power to businesses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Among the initiatives highlighted was the net metering programme, designed to reduce electricity costs for industries, businesses and households while improving environmental sustainability standards for exporters facing increasingly stringent international trade requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He also cited ongoing investments in captive renewable energy projects, including a solar installation at the Tema enclave with a current capacity of about 16MW, supplying power to customers at competitive rates. Government has approved plans for the project to scale up to 200MW, with a long-term target of 1,000MW by 2030.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ministry further disclosed that it is accelerating efforts to promote electric mobility through the Renewable Energy Fund, which is expected to support the establishment of electric vehicle charging infrastructure powered by renewable energy across the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Other interventions include the Public Facilities Sustainable Energy Action Plan and the National Energy Efficiency Action Plan being implemented with support from to improve energy efficiency in public institutions and free additional power for industrial use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Government is also rolling out solar-powered irrigation initiatives to support year-round farming, improve agricultural productivity and create employment opportunities for young people.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ministry stressed that strengthening the national grid remains essential to integrating renewable energy into the power mix and ensuring long-term energy security.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It also urged businesses to combine renewable energy systems with battery energy storage technologies to improve efficiency and ensure stable power supply beyond daylight hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The AGI Sustainable Energy B2B Expo was organised by the Association of Ghana Industries, in collaboration with in Accra GIZ.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AGI\u2019s President, Kofi Nsiah-Poku, for his part, called for accelerated investment in renewable energy, warning that rising energy costs and unreliable power supply continue to undermine , he said sustainable energy had become central to Ghana\u2019s industrial transformation agenda and could no longer be treated as a peripheral development issue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mr. Nsiah-Poku noted that industries across the country were under growing pressure to reduce operational costs while meeting international environmental standards, making the transition to cleaner energy both an economic and strategic necessity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to him, adopting smarter and more efficient energy solutions would help businesses improve productivity, lower long-term costs and strengthen their competitiveness in global markets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He stated that renewable energy, particularly solar power, presents significant opportunities for Ghanaian industry by supporting administrative operations, cooling systems, lighting and light industrial processes, while the national grid continues to power heavy manufacturing activities. Such a diversified energy mix, he explained, would reduce pressure on the national grid, improve energy security and contribute to a more resilient industrial sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mr. Nsiah-Poku further stressed that Ghana\u2019s ambition of building a strong industrial economy and sustaining a 24-hour economy could not be achieved without stable and uninterrupted electricity supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He said recent energy disruptions had exposed the vulnerability of businesses that rely heavily on a single source of power, reinforcing the need for industries to embrace alternative and renewable energy solutions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The AGI President also urged government to strengthen policy support for renewable energy adoption through tax incentives, affordable green financing and faster regulatory approvals. He described the national net metering programme as a potentially transformative intervention for industry, saying businesses were ready to invest in rooftop solar systems if implementation processes became more efficient and predictable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Click <a href=\"https:\/\/thebftonline.com\/2026\/05\/29\/govt-targets-1400mw-renewable-energy-capacity-by-2030\/\" rel=\"nofollow noopener\" target=\"_blank\">here<\/a> for source<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Government is targeting at least 1,400 megawatts (MW) of installed renewable energy capacity by the end of the decade as part of efforts to reduce energy costs, improve industrial competitiveness and accelerate the country\u2019s transition to sustainable energy. The Ministry of Energy and Green Transition said &nbsp;the country currently has about 280MW of installed renewable<\/p>\n","protected":false},"author":10,"featured_media":16085,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"yes","rop_publish_now_accounts":[],"rop_publish_now_history":[],"rop_publish_now_status":"pending","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[153],"tags":[],"class_list":["post-16083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-articles"],"jetpack-related-posts":[{"id":15996,"url":"https:\/\/gnbcc.net\/2027-to-test-renewable-energy-ambitions\/","url_meta":{"origin":16083,"position":0},"title":"2027 to test\u00a0renewable energy ambitions","author":"Grace Agorigo","date":"May 22, 2026","format":false,"excerpt":"The government is preparing to move the country\u2019s renewable energy agenda beyond pilot projects and policy commitments into a commercially driven expansion phase from 2027, betting on solar, wind and clean industrial power to reduce dependence on costly thermal generation and strengthen long-term energy security. The planned transition, being championed\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-18.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-18.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-18.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-18.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-18.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":13730,"url":"https:\/\/gnbcc.net\/ghana-to-host-refa-2025-in-accra-agi-and-afsia-join-forces-for-a-greener-future\/","url_meta":{"origin":16083,"position":1},"title":"Ghana to Host REFA 2025 in Accra: GNBCC Premium Member Dutch &amp; Co Joins Drive for a\u00a0Greener\u00a0Future\u00a0","author":"Michael Teye","date":"November 7, 2025","format":false,"excerpt":"The Association of Ghana Industries (AGI), in collaboration with the Africa Solar Industry Association (AFSIA), has announced its partnership to host the 2025 edition of the Renewable Energy Forum Africa (REFA) in Accra from December 3 to 4.\u00a0Dutch & Co, a Premium Member of the Ghana Netherlands Business & Culture\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/GI.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":15502,"url":"https:\/\/gnbcc.net\/power-grid-in-high-risk-zone-ies\/","url_meta":{"origin":16083,"position":2},"title":"Power grid in high-risk zone \u2013 IES","author":"Michael Teye","date":"March 27, 2026","format":false,"excerpt":"The national electricity transmission network has entered what the Institute for Energy Security (IES) describes as a \u2018higher-risk zone\u2019, after a decade of rapid demand growth failed to elicit commensurate investment in grid infrastructure.","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/AAC-scaled.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/AAC-scaled.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/AAC-scaled.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/AAC-scaled.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/AAC-scaled.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/AAC-scaled.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":16106,"url":"https:\/\/gnbcc.net\/govt-targets-3000mw-power-expansion-by-2030\/","url_meta":{"origin":16083,"position":3},"title":"Gov\u2019t targets 3,000MW power expansion by 2030","author":"Grace Agorigo","date":"June 5, 2026","format":false,"excerpt":"Finance minister Dr. Cassiel Ato Forson has disclosed that the nation has set a target of adding 3,000 megawatts (MW) of new electricity generation capacity by 2030. At least 30 percent of the planned capacity is expected to come from renewable energy sources, as government seeks to narrow the growing\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/06\/ESQ-Elsie-2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/06\/ESQ-Elsie-2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/06\/ESQ-Elsie-2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/06\/ESQ-Elsie-2.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/06\/ESQ-Elsie-2.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":15379,"url":"https:\/\/gnbcc.net\/oil-price-spikes-from-iran-conflict-remove-taxes-on-fuel-to-cushion-consumers\/","url_meta":{"origin":16083,"position":4},"title":"Oil price spikes from Iran conflict: Remove taxes on fuel to cushion consumers","author":"Michael Teye","date":"March 13, 2026","format":false,"excerpt":"Two downstream petroleum sector think tanks are convinced that fuel prices at the pump could rise to abnormal levels beyond the next pricing window on Monday, but want the government to consider removing some of the existing fuel taxes to cushion consumers from the impact of the global petroleum supply\u2026","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/Oil-taxes-scaled.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/Oil-taxes-scaled.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/Oil-taxes-scaled.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/Oil-taxes-scaled.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/Oil-taxes-scaled.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2026\/03\/Oil-taxes-scaled.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":13928,"url":"https:\/\/gnbcc.net\/2026-budget-gh%c2%a2302-5bn-reset-budget-to-drive-growth-jobs-and-transformation\/","url_meta":{"origin":16083,"position":5},"title":"2026 Budget: GH\u00a2302.5bn \u2018reset budget\u2019 to drive growth, jobs and transformation","author":"Michael Teye","date":"November 14, 2025","format":false,"excerpt":"Government has unveiled a GH\u00a2302.5 billion 2026 Budget themed\u00a0\u201cResetting for Growth, Jobs and Economic Transformation,\u201d\u00a0aimed at consolidating macroeconomic stability while unlocking investments in infrastructure, agriculture, energy and social sectors to create sustainable jobs.","rel":"","context":"In &quot;News Articles&quot;","block_context":{"text":"News Articles","link":"https:\/\/gnbcc.net\/category\/news-articles\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/budget2026.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/budget2026.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/budget2026.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/budget2026.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/gnbcc.net\/wp-content\/uploads\/2025\/11\/budget2026.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/gnbcc.net\/wp-content\/uploads\/2026\/05\/ESQ-Elsie-22.png","_links":{"self":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts\/16083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/comments?post=16083"}],"version-history":[{"count":1,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts\/16083\/revisions"}],"predecessor-version":[{"id":16086,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/posts\/16083\/revisions\/16086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/media\/16085"}],"wp:attachment":[{"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/media?parent=16083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/categories?post=16083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gnbcc.net\/wp-json\/wp\/v2\/tags?post=16083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}